Rail Girder being moved by 15-ton Overhead Crane |
• One 15 ton overhead bridge crane over weld shop
• One 5 ton overhead bridge crane over sheetmetal shop
• Two 2 ton jib cranes over individual weld stations
• Forklifts up to 36,000 lbs.
• Comprehensive material tracking and documentation program (Material Test Report [MTR] management) and incoming inspection program
This comment has been removed by the author.
ReplyDeleteLifting Gear London A very awesome blog post. We are really grateful for your blog post. You will find a lot of approaches after visiting your post.
ReplyDelete